India's power sector reached a landmark milestone in the second quarter of 2025, with renewable energy sources, including large hydropower, comprising 48.3% of the nation's total installed electricity capacity. This achievement, equivalent to 234.2 gigawatts (GW), is a direct result of a decade of concerted policy focus, aggressive capacity auctions, and a surge in domestic and international investment. It signals the successful culmination of the first phase of India's energy transition, which prioritized achieving scale and cost-competitiveness for renewable technologies, particularly solar power. The rapid expansion, driven by a 33.5% year-over-year growth in solar capacity, has fundamentally reshaped the country's energy infrastructure landscape.
However, this report finds that the headline capacity figure masks a more complex reality. A critical paradox lies at the heart of India's energy sector: while renewable capacity is nearing parity with conventional sources, fossil fuels, led by coal, continue to supply approximately 75% of the country's actual electricity generation. This disparity, rooted in the lower plant load factors of intermittent renewables compared to dispatchable thermal plants, underscores that India is not yet undergoing a true energy transition but rather a massive, dual-track capacity expansion to meet its burgeoning energy demand. This strategy, while ensuring short-term energy security, creates a significant long-term risk of stranded thermal assets and jeopardizes climate commitments.
The analysis reveals that the primary challenge for India's energy sector has decisively shifted from deployment to integration. The very success in adding gigawatts of variable renewable energy has pushed the national grid to its limits, manifesting in severe transmission bottlenecks, high levels of energy curtailment in renewable-rich states, and acute grid instability issues such as the "duck curve." Furthermore, the persistent financial distress of state-owned distribution companies (DISCOMs) remains the single greatest impediment to progress, creating off-taker risk for generators and starving the distribution network of the capital needed for modernization.
The path forward demands a strategic pivot from a singular focus on capacity addition to a holistic approach centered on system integration. This report identifies three interdependent pillars for the next phase of India's transition:
- Scaling Energy Storage: The rapid deployment of Battery Energy Storage Systems (BESS) and Pumped Storage Projects (PSP) is no longer optional but essential for managing intermittency and ensuring grid reliability. Government initiatives like the Viability Gap Funding (VGF) scheme are critical but must be accelerated to meet the national target of over 60 GW of storage by 2030.
- Modernizing the Grid: A comprehensive overhaul of the transmission and distribution network is imperative. This involves both physical expansion through the Green Energy Corridors and the deployment of digital technologies, including a nationwide rollout of smart meters, to create an intelligent, flexible, and resilient grid.
- Reforming the Market: Fundamental reforms are required to address the financial unsustainability of DISCOMs and create market mechanisms that properly value flexibility and reliability. This includes enforcing Renewable Purchase Obligations (RPOs), designing robust ancillary service markets, and implementing rational tariff structures.
For investors and policymakers, the 48.3% milestone is not an end goal but a critical inflection point. Success is no longer measured in gigawatts installed but in the ability to deliver clean, reliable, and affordable power 24/7. Achieving this will require unprecedented investment, political will, and technical innovation focused squarely on integrating India's vast renewable resources into a modern, resilient, and decarbonized energy system.
Deconstructing the Milestone: India's Power Capacity in Q2 2025
The second quarter of 2025 marked a watershed moment for India's energy sector, symbolizing a decade of policy-driven transformation. The country's installed renewable energy capacity reached a share just shy of parity with conventional sources, a testament to an aggressive and sustained push towards clean energy. This section meticulously deconstructs this headline achievement, providing the statistical foundation for the report by breaking down the capacity by source, tracing its historical growth, and analyzing the corresponding shift in the conventional power landscape.
The Headline Achievement: 234.2 GW of Renewables
As of the end of the second quarter of 2025 (June 30, 2025), India's total installed renewable energy (RE) capacity, a figure that includes large hydroelectric projects, reached 234.2 GW. This milestone represents a 48.3% share of the country's total cumulative power capacity, which stood at approximately 485 GW.1 This achievement places India on the cusp of its goal to source 50% of its installed power capacity from non-fossil fuel sources, a target it is poised to meet well ahead of the 2030 deadline.
The growth momentum is significant. This figure marks a substantial Quarter-on-Quarter (QoQ) increase from the 218.6 GW (a 46.1% share) recorded at the end of Q1 2025, indicating an addition of over 15 GW of renewable capacity in a single quarter. Data from the National Power Portal corroborates this scale, reporting a total national installed capacity of 486 GW in August 2025, confirming the near-50% share for renewables.5 This rapid expansion underscores the accelerating pace of India's energy transition infrastructure build-out.
Source-by-Source Breakdown: Solar's Dominance and Wind's Steady Contribution
The surge in renewable capacity is not uniform across all sources; it is overwhelmingly led by solar power, with wind energy providing a steady, significant contribution.
Solar Power: Solar energy is the undisputed engine of India's renewable growth. As of June 2025, solar capacity constituted 24% of India's total installed power capacity and a commanding 49.7% of the total renewable capacity, making it the single largest renewable source. By the end of July 2025, the total solar capacity had climbed to 119.02 GW. This capacity is diversified across several segments, as detailed by the Ministry of New and Renewable Energy (MNRE).
Ground-Mounted Utility-Scale: 90.99 GW
Grid-Connected Rooftop: 19.88 GW
Hybrid Projects (Solar Component): 3.06 GW
Off-Grid Solar: 5.09 GW
Wind Power: Wind power remains a crucial pillar of the renewable portfolio. By the end of Q2 2025, wind installations reached 51.7 GW, accounting for 10.7% of the country's total power capacity. This figure saw a modest increase to 52.14 GW by July 31, 2025, reflecting a more mature and steadier growth trajectory compared to solar.
Biomass and Small Hydro: Other renewable sources play a smaller but important role in diversifying the energy mix. As of June 2025, biomass contributed 2.2% and small hydropower 1.1% to the total installed capacity. By the end of July 2025, cumulative capacity stood at 10.74 GW for biomass (combining bagasse and non-bagasse cogeneration) and 5.1 GW for small hydro power projects.
1.3 The Role of Large Hydropower and Other Renewables
A crucial nuance in the official 48.3% figure is the inclusion of large hydroelectric projects (defined as projects with a capacity greater than 25 MW). These mature, dispatchable assets are vital to the statistical milestone. As of June 2025, large hydro capacity stood at 49.4 GW, representing 10.2% of the total power mix.1 By July 31, 2025, this figure was 49.63 GW.6
While the inclusion of large hydro is standard in India's non-fossil fuel capacity accounting, it is essential to distinguish it from variable renewable energy (VRE) sources like solar and wind. Excluding the 49.6 GW of large hydro, the share of VRE and other smaller renewables (solar, wind, biomass, small hydro) stands at approximately 38.7% of total national capacity (187.9 GW out of ~485 GW). This distinction is vital for a clear-eyed assessment of the grid integration challenges, as the primary issues of intermittency, variability, and grid stability stem from the rapid proliferation of VRE, not from established hydro power.
Significantly, Q2 2025 also witnessed substantial additions in pumped storage hydro (PSP), a key energy storage solution. The commissioning of THDC's Tehri PSP Unit-1 (250 MW) and five units of Greenko's Pinnapuram project (totaling 1,200 MW) signals a growing strategic focus on building storage capacity to complement the VRE expansion.
1.4 Historical Context: Tracking the Trajectory of Growth (2014-2025)
The growth to nearly 235 GW of renewable capacity is the result of an exponential expansion over the past decade. The transformation has been particularly pronounced in the solar sector, which has surged approximately 38-fold from a mere 2.82 GW in March 2014 to over 107 GW by mid-2025. Over the same period, wind capacity more than doubled from 21 GW to over 52 GW.
The year-over-year (YoY) growth rate for total renewable energy capacity was a robust 19% as of Q2 2025. However, this figure is dwarfed by the blistering 33.5% YoY growth in solar capacity. This highlights that the overall expansion is not just rapid but is also disproportionately driven by a single technology. This solar-centric growth profile, while a testament to the success of solar policies and cost reductions, creates specific and acute grid management challenges, most notably the "duck curve" phenomenon, which will be discussed in detail in last Section.
The acceleration is starkly visible in annual addition data. The financial year 2024-25 saw a record 29.5 GW of renewable capacity added, with solar alone contributing 23.8 GW—a historic high. In the first four months of FY 2025-26 alone (April-July 2025), India added another 15.5 GW of renewables (excluding large hydro), with solar accounting for over 13.3 GW of that addition, continuing the trend of solar dominance.
The Declining Share of Conventional Power
The rise of renewables is mirrored by a corresponding decline in the share of conventional power sources. At the end of Q2 2025, the installed capacity of conventional power (coal, gas, lignite, diesel) stood at 250.8 GW, or 51.7% of the total mix. This is a notable decrease from its 53.9% share in the previous quarter.
This shift is not merely relative; it reflects a tangible, albeit slow, physical transformation of India's power asset base. During Q2 2025, the commissioning of 1.3 GW of new coal-fired capacity (from NTPC's Barh and UPRVUNL's Obra C projects) was more than offset by the decommissioning of approximately 2 GW of older, less efficient coal plants, resulting in a net decrease in coal capacity of 0.23%. The decline was even more pronounced for gas-based power, which saw its capacity shrink by a significant 17.9% during the quarter due to the retirement of multiple units. While coal remains the backbone of the system, these figures indicate the beginning of a structural shift where the retirement of aging fossil fuel assets is starting to outpace new additions.
Table 1: India's Installed Power Capacity Breakdown (as of June 30, 2025). Note: Data compiled and synthesized from multiple sources including, and for the most accurate representation of the end-of-quarter status. Minor discrepancies may exist due to different reporting dates and methodologies. Solar capacity reflects MNRE data from end of June 2025.
The Generation Paradox: Capacity vs. Actual Power Supply
While the 48.3% renewable capacity milestone is a monumental achievement in infrastructure development and policy execution, it presents an incomplete and potentially misleading picture of India's energy reality. A fundamental paradox exists between installed capacity (measured in gigawatts, GW) and actual electricity generation (measured in terawatt-hours, TWh). This section delves into this critical distinction, revealing that despite near-parity in capacity, fossil fuels—particularly coal—remain the undisputed king in supplying the energy that powers India's economy. Understanding this paradox is essential for grasping the true scale of the decarbonization challenge ahead.
Analyzing the Energy Mix: Why Coal Remains King in Generation
The data on electricity generation paints a starkly different picture from the capacity data. While non-fossil fuel capacity is approaching the 50% mark, fossil fuels continue to account for the vast majority of actual energy consumed. In the first half of 2025, coal, oil, and gas-fired plants were responsible for generating approximately 75% of the nation's electricity. This demonstrates that the operational energy mix is still heavily carbon-intensive.
Looking at annual figures, the dominance of coal is even more evident. In the calendar year 2024, coal-fired power plants generated an enormous 1,517.9 TWh of electricity. In stark contrast, all renewable sources combined produced only 240.5 TWh. This vast gap highlights that for every unit of electricity generated by renewables, more than six units were generated by coal.
This operational reality has led analysts to conclude that India is not yet undergoing a true "energy transition" in the sense of replacing fossil fuels. Instead, the country is pursuing a strategy of "energy capacity expansion" on all fronts. The government's explicit plan to install an additional
80 GW of new thermal power capacity alongside its ambitious renewable targets confirms this dual-track approach. This strategy is driven by the primary national objective of ensuring energy security and meeting a rapidly growing demand for power, which cannot yet be reliably met by intermittent renewables alone.
Seasonal and Diurnal Variability: A Tale of Solar Days and Windy Nights
The contribution of renewables to the grid is not constant; it is subject to significant fluctuations based on weather patterns, time of day, and season. This variability is a defining characteristic of the generation mix.
For instance, in June 2025, a month typically characterized by strong monsoonal winds in many parts of India, wind energy was the leading renewable contributor. Wind farms generated 14,879.54 million units (MU), narrowly surpassing the 12,927.48 MU generated by solar power. In contrast, during the sunnier and less windy month of March 2025, solar energy dominated, contributing nearly 70% of the total renewable generation (excluding large hydro).
This seasonal see-saw between solar and wind presents a complex challenge for grid operators, who must constantly balance these fluctuating inputs to maintain grid stability. The challenge is amplified by the fact that solar and wind are overwhelmingly the dominant sources of new renewable generation. In June 2025, these two sources combined accounted for a massive 93.75% of all renewable electricity generated (excluding large hydro). This concentration of variability in just two sources, one diurnal (solar) and one seasonal/stochastic (wind), makes the grid more susceptible to fluctuations than a more diversified renewable portfolio that might include steadier sources like geothermal or biomass.
Plant Load Factor (PLF) Analysis: Renewables vs. Thermal
The technical underpinning of the capacity-generation paradox is the vast difference in the Plant Load Factor (PLF), or capacity utilization factor, between conventional and renewable power plants. PLF is a measure of the actual output of a power plant over a period of time compared to its maximum possible output.
Thermal Power: Conventional thermal plants (coal, gas, nuclear) are dispatchable, meaning their output can be controlled to meet demand. They are designed to operate continuously for long periods, resulting in high PLFs. The average PLF for India's thermal power plants reached 68.8% in the first ten months of FY2025, indicating high utilization.
Renewable Power: In contrast, solar and wind power plants are intermittent and non-dispatchable. Their output depends entirely on the availability of sunlight and wind. Consequently, their PLFs are inherently much lower. Competitive tenders in India typically specify a minimum required Capacity Utilisation Factor (CUF), a metric similar to PLF, in the range of 19% to 30% for solar and wind projects.
This means that a 1 GW coal plant operating at a 69% PLF will generate approximately three times more electricity over a year (1 GW×8760 hours×0.69=6044 GWh) than a 1 GW solar plant operating at a 23% PLF (1 GW×8760 hours×0.23=2015 GWh). This fundamental difference explains why a near-50% share in capacity translates to a much smaller share in actual generation.
Implications for Energy Security and Decarbonization
The dual-track strategy of building both renewable and thermal capacity has profound and conflicting implications. From an energy security standpoint, the government views the continued reliance on coal as a necessary measure to meet the country's soaring peak electricity demand. This demand hit a record 250 GW in May 2024 and is projected by industry leaders to reach 270 GW in the summer of 2026, far exceeding what renewables can currently guarantee.
However, this strategy creates a significant long-term risk of stranded assets. The 80 GW of new thermal plants being planned will have operational lifespans of 30-40 years, extending their operation well into the 2060s. This timeline is in direct conflict with India's climate goals, which require a phase-out of unabated coal power well before the country's 2070 net-zero target date. As the cost of renewable energy coupled with energy storage continues to fall, these new coal plants risk becoming economically uncompetitive long before their technical life ends. Utilities could be locked into long-term Power Purchase Agreements (PPAs) for expensive coal power, creating a massive financial liability for DISCOMs and, ultimately, the public. The case of Rajasthan, which floated a tender for a 3,200 MW thermal plant that the Central Electricity Authority's revised analysis deemed unnecessary, serves as a potent real-world example of this potential for over-investment and future stranded assets.
This dynamic reveals a calculated political and economic balancing act. The external narrative, aimed at the international community, focuses on headline-grabbing capacity milestones like 48.3% to showcase climate leadership and attract green investment. The internal narrative, driven by domestic imperatives, focuses on energy security and affordability, which currently translates to a continued reliance on the established coal ecosystem. Understanding this duality is key to interpreting India's seemingly contradictory policy decisions—it is a pragmatic, if risky, approach to managing the complex trade-offs between economic growth and climate action.
The Engine Room: Policy, Regulation, and Investment
The remarkable growth in India's renewable energy capacity is not an accident of market forces alone. It is the direct outcome of a deliberate, multi-pronged strategy orchestrated by the government over the last decade. This strategy combines ambitious national targets, robust manufacturing incentives, regulatory mandates for adoption, and a concerted effort to attract both domestic and international capital. This section analyzes these key drivers, dissecting the engine room that has powered India's renewable surge.
The Policy Foundation: From National Missions to Global Pledges
The foundation of India's renewable energy push is a clear and consistent set of long-term policy signals. The country's commitments on the global stage, particularly the "Panchamrit" goals announced at COP26, set the overarching targets: achieving 500 GW of non-fossil fuel-based energy capacity by 2030 and reaching Net Zero emissions by 2070. These ambitious pledges provide a directional compass for the entire energy ecosystem.
These high-level targets are supported by a suite of specific national missions and schemes. The foundational National Solar Mission, launched over a decade ago, created the initial ecosystem for solar power development. More recent initiatives have expanded this focus. The National Green Hydrogen Mission, launched in 2023 with an outlay of ₹19,744 crore, aims to make India a global hub for green hydrogen production, creating future demand for renewable electricity. The PM Surya Ghar: Muft Bijli Yojana, a massive rooftop solar initiative launched in 2024, targets the residential sector to accelerate decentralized generation.
Crucially, these missions are backed by concrete financial incentives that improve project economics. A key policy driver has been the waiver of Inter-State Transmission System (ISTS) charges for solar and wind projects commissioned before June 2025 (with further extensions for storage and green hydrogen projects).3 This waiver significantly reduces the cost of transmitting power from renewable-rich states to demand centers, directly boosting the financial viability of new projects and spurring the recent surge in installations.
Driving Domestic Manufacturing: The Impact of the Production-Linked Incentive (PLI) Scheme
A central pillar of India's strategy is the principle of Atmanirbhar Bharat (Self-Reliant India). In the renewable sector, this has manifested as a powerful push to build a domestic manufacturing ecosystem and reduce the heavy reliance on imported components, particularly solar modules. The primary instrument for this is the Production-Linked Incentive (PLI) Scheme for High-Efficiency Solar PV Modules.
With a combined outlay of over ₹24,000 crore (approximately US$2.9 billion) across two tranches, the PLI scheme aims to incentivize the establishment of 48.3 GW of integrated solar manufacturing capacity, from polysilicon to modules. The scheme provides direct financial incentives to manufacturers based on their sales of high-efficiency modules, rewarding scale and technological advancement.
The impact of the PLI scheme has been swift and significant. As of June 30, 2025, manufacturing plants with a capacity of 18.5 GW for modules, 9.7 GW for cells, and 2.2 GW for ingot-wafers have already become operational under the scheme's ambit. This has contributed to a massive increase in India's total domestic solar module manufacturing capacity, which reached 91.6 GW by mid-2025 according to the official Approved List of Models and Manufacturers (ALMM). This domestic ramp-up has had a tangible effect on trade flows, with solar module imports declining from $3.36 billion in FY 2021-22 to $2.15 billion in FY 2024-25. This demonstrates a strategic pivot: India is no longer content to be merely a large market for renewable energy; it is actively building the industrial base to become a global supplier. This intertwining of energy policy and industrial strategy is a sophisticated evolution, linking climate goals directly with economic development, job creation, and enhanced national security.
Mandating Adoption: The Efficacy and Challenges of Renewable Purchase Obligations (RPOs)
While incentives encourage supply, the government uses regulatory mandates to ensure demand. The key tool for this is the Renewable Purchase Obligation (RPO) framework. RPOs legally require electricity distribution companies (DISCOMs), captive power producers, and other large consumers to procure a specified minimum percentage of their electricity from renewable sources.
The Ministry of Power has set an aggressive national RPO trajectory, which mandates a progressive increase in the share of renewables, targeting 39% by the year 2028. This provides a clear, long-term demand signal for renewable power.
However, the RPO regime faces significant challenges in implementation. While the targets are set at the national level, enforcement lies with the State Electricity Regulatory Commissions (SERCs). Compliance across states is inconsistent and often weak. Many DISCOMs, particularly those in poor financial health, consistently fail to meet their RPO targets. The designated compliance mechanism—purchasing Renewable Energy Certificates (RECs) from the open market to cover shortfalls—is frequently underutilized. This gap between central policy ambition and state-level execution remains a critical weakness, creating uncertainty for developers and undermining the "must-run" status that renewable power is supposed to enjoy.
The Flow of Capital: Analyzing FDI, Climate Finance, and Green Bonds
India's renewable energy sector has successfully positioned itself as a prime destination for global capital. This is reflected in the dramatic increase in Foreign Direct Investment (FDI). The renewable energy sector's share of total FDI inflows into India surged from approximately 1% in FY21 to nearly 8% in the first three quarters of FY25. During this period alone, the sector attracted $3.4 billion in FDI, nearly matching the total for the entire preceding fiscal year.
A notable evolution in the investment landscape is the shift in strategy by major international investors. Large, sophisticated climate-focused funds such as TPG Rise Climate, Breakthrough Energy Ventures, and LeapFrog Investments are moving beyond small, isolated project financing. They are now making strategic, large-scale "platform plays"—investing in companies that can build integrated value chains across generation, storage, e-mobility, and battery lifecycle management.29 This shift is driven by the fact that renewable energy has reached cost-parity with conventional options in India, making it an economically rational choice, not just an environmental one.29 This trend indicates a maturing and consolidating market, where well-capitalized, integrated operators are likely to dominate, potentially posing challenges for smaller, less-diversified players.
To complement private capital, the government is also actively tapping into public and institutional green finance channels. The Reserve Bank of India (RBI) has conducted several auctions of sovereign green bonds, raising a total of $3.8 billion in FY25 to help fund public sector clean energy and environmental projects.
The Economic Dividend: Job Creation and Green Growth
The transition to renewable energy is not just an environmental imperative but also a significant economic opportunity. The sector has emerged as a major engine of job creation. According to a 2024 review by the International Renewable Energy Agency (IRENA), India's renewable energy sector provided an estimated 1.02 million direct and indirect jobs in 2023. Hydropower was the largest employer with 453,000 jobs, followed closely by the solar PV sector, which employed approximately 318,600 people in both on-grid and off-grid segments.
The future employment potential is even more substantial. Independent analysis by the Council on Energy, Environment and Water (CEEW) and other institutions projects that the renewable energy sector could employ over 3.2 million people by 2050.32 Distributed renewable energy (DRE) technologies, such as rooftop solar, biomass power, and small hydro, are found to be particularly job-intensive per megawatt of installed capacity, suggesting that a focus on decentralized energy can maximize employment benefits.
Beyond direct employment, the growth of the green economy creates a positive multiplier effect across associated industries. For example, India's ambitious solar targets are fueling a surge in demand for critical industrial commodities like silver, an essential material in the manufacturing of solar PV cells. This creates new investment and growth opportunities in the mining and materials sectors, further integrating the clean energy transition into the broader industrial economy.
The Geographic Dimension: A State-Level Deep Dive
The narrative of India's energy transition is not a monolithic one. It is a complex mosaic of diverse stories playing out across the country's states and union territories. National averages, while useful, often mask critical regional variations in resource potential, policy implementation, and investment attractiveness. This section moves from the national to the sub-national level, providing a granular analysis of the geographic dimension of the renewable energy boom, identifying the leading states, and highlighting the structural imbalances that define the next set of challenges for India.
The Vanguard States: Analyzing the Success of Rajasthan, Gujarat, and Tamil Nadu
A small cohort of states has been at the vanguard of India's renewable energy deployment, consistently leading in capacity additions. As of the first half of 2025, Rajasthan was the undisputed leader with 37.4 GW of installed renewable capacity, driven primarily by its massive solar installations. It was closely followed by Gujarat, with 35.5 GW, which boasts a strong portfolio of both solar and wind power.
Tamil Nadu, a long-time leader in wind energy, also remains a top performer with significant capacity.
The success of these states is rooted in a confluence of factors. First and foremost is their immense natural resource endowment. Rajasthan possesses vast, sun-drenched desert terrain ideal for large-scale solar parks, while Gujarat and Tamil Nadu have long coastlines with high wind potential. This natural advantage is complemented by proactive state-level policies, including the development of dedicated solar and wind parks, streamlined project approval processes, and attractive land allotment policies that have created an enabling environment for developers.2 These states have effectively leveraged their resources to become the primary hubs of India's green energy generation.
A Comprehensive State-wise Analysis of Installed Capacity and Potential
To understand the full geographic landscape, it is essential to compare the current installed capacity in each state against its total estimated renewable energy potential. This comparison reveals which states are effectively harnessing their resources and which have significant untapped opportunities for future growth.
The following table provides a detailed state-wise breakdown of installed renewable energy capacity as of July 31, 2025, juxtaposed with the estimated total renewable power potential for each state. The "% of Potential Realized" metric offers a clear indicator of the maturity of the renewable market in each region.
Table 2: State-wise Renewable Energy Installed Capacity and Potential (as of July 31, 2025). Note: Installed capacity data is from MNRE as of July 31, 2025. Estimated potential data is from MOSPI as of March 31, 2024. "N/A" indicates data was not available for that state in the provided sources. The total installed RE capacity includes large hydro where applicable for consistency with national figures.
The data clearly shows that even the leading states have only begun to scratch the surface of their total potential. Rajasthan, despite being the leader in installations, has realized less than 9% of its massive estimated potential. This indicates that there remains an enormous runway for future growth, not just in the leading states but across the country.
Regional Disparities: The Challenge of Concentrated Generation and Dispersed Demand
One of the most critical structural challenges emerging from the state-level analysis is the profound geographic mismatch between renewable energy supply and electricity demand. The country's richest renewable resources—and consequently, the bulk of its generation capacity—are heavily concentrated in the western states (Rajasthan, Gujarat) and southern states (Tamil Nadu, Karnataka, Andhra Pradesh).
In contrast, some of the largest centers of electricity consumption are located hundreds or thousands of kilometers away in the northern and eastern regions, including the industrial and population hubs of Delhi-NCR, Uttar Pradesh, West Bengal, and Bihar. This geographic divide creates a fundamental logistical problem: the green electrons are being produced far from where they are needed most.
This disparity necessitates a massive expansion and strengthening of the Inter-State Transmission System (ISTS) to create "green energy corridors" capable of evacuating huge volumes of power from the RE-rich states to the high-demand states. In the absence of adequate transmission capacity, RE-rich states face a frustrating paradox: they have abundant, cheap, clean power available but are forced to curtail it (i.e., instruct generators to shut down) because the grid cannot carry it away. This not only wastes clean energy but also damages the financial health of generation projects, creating a significant deterrent for future investment.
This dynamic is fostering a new form of "energy federalism," where states like Rajasthan and Gujarat are evolving into "energy exporters." This creates new and complex inter-state dependencies and potential for friction over critical issues such as the allocation of transmission access, the sharing of costs for massive grid upgrades, and the equitable enforcement of RPO compliance among states that are importing green power versus those that are producing it.
Case Studies: State-level Policy Innovations and Implementation Hurdles
The national statistics are an aggregate of unique challenges and opportunities at the state level. Examining specific cases reveals the practical complexities of the transition.
Case Study 1: Rajasthan's "Duck Curve" Challenge. With its world-class solar resources and over 23 GW of solar capacity, Rajasthan serves as a real-world laboratory for the challenges of high solar penetration. The state's grid experiences a severe "duck curve" on a daily basis: a massive surge of solar generation during midday hours depresses electricity prices and can cause grid instability, followed by a precipitous drop in generation at sunset, which requires an extremely rapid ramp-up of conventional power to meet the evening peak. This operational nightmare leads to significant curtailment of solar power, estimated at 5-10% during peak sun hours, as grid operators struggle to maintain stability. Rajasthan's experience underscores the urgent need for grid-scale energy storage and flexible generation sources.
Case Study 2: Tamil Nadu's Wind Integration Woes. As a pioneer in wind energy in India, Tamil Nadu faces a different kind of integration challenge: seasonal mismatch. The state's wind generation peaks during the monsoon season (May to September), a period when electricity demand can be relatively lower due to cooler temperatures and reduced agricultural pumping loads. This misalignment between supply and demand leads to high levels of wind power curtailment, sometimes reaching as high as 15-20%. This highlights the need for better forecasting, demand-side management, and inter-state power trading to absorb seasonal surpluses.
These state-level realities demonstrate that for renewable energy developers and investors, the business case is becoming highly location-dependent. A national-level view is no longer sufficient. A sophisticated assessment must now involve a granular, state-specific analysis of not just resource quality, but also policy stability, land acquisition processes, grid availability and curtailment risk, and, critically, the financial health and payment track record of the local DISCOM. These factors, which vary dramatically from state to state, are now the primary determinants of project risk and return.
The Double-Edged Sword: Navigating the Challenges of Integration
The phenomenal success of India's renewable energy deployment is a double-edged sword. While the rapid addition of gigawatts of clean capacity is a celebrated achievement, it has simultaneously pushed the country's power system to a new set of technical, financial, and operational breaking points. The challenges have evolved from how to build renewables to how to integrate them. This section critically examines the profound hurdles that India must overcome to move from a system with a high share of renewable capacity to one that can reliably and affordably operate on a high share of renewable generation.
The Grid's Breaking Point: Transmission Congestion and Curtailment
The most immediate and tangible challenge is that the pace of renewable energy capacity addition is far outstripping the development of the necessary transmission infrastructure.38 This has created severe congestion on the grid, particularly on the inter-state transmission lines designed to evacuate power from the renewable-rich regions of the west and south to the load centers in the north and east.
This congestion leads directly to curtailment, a practice where grid operators are forced to order fully operational and available renewable power plants to reduce or stop their generation because there is no physical capacity on the wires to transport the electricity. This is not a theoretical problem; it is a daily reality that results in the wastage of vast amounts of clean, zero-fuel-cost energy. In states with the highest renewable penetration, curtailment levels are alarmingly high. Wind power curtailment in Tamil Nadu can reach 15-20% during peak season, while solar power curtailment in Rajasthan is estimated at 5-10% during hours of maximum sunshine.
This situation creates a dangerous negative feedback loop. Curtailment directly erodes the revenue and profitability of renewable energy projects. When investors and lenders model the financials for new projects, they must now factor in a significant "curtailment risk," which makes projects appear less bankable and increases the cost of capital.39 This, in turn, can slow down the very deployment of new renewable capacity that is needed to meet India's targets. The problem of grid congestion thus actively hinders its own solution. While the Central Electricity Authority (CEA) has developed a comprehensive Transmission Master Plan that calls for an investment of $30 billion by 2030 to build out the necessary infrastructure, including the Green Energy Corridors, the implementation of these long-gestation projects continues to lag behind the rapid commissioning of generation assets.
Taming the "Duck Curve": The Technical Challenge of Solar Intermittency
The solar-centric nature of India's renewable boom has given rise to a specific and severe grid management challenge known as the "duck curve". This phenomenon, named for the shape it creates on a graph of daily electricity demand, is a direct consequence of massive solar power injection into the grid.
During the middle of the day (roughly 10 a.m. to 4 p.m.), solar generation floods the system, causing the "net demand" (total demand minus renewable generation) to plummet. This can lead to an oversupply of power, crashing wholesale electricity prices and creating operational issues for conventional power plants that cannot ramp down quickly enough. Then, as the sun sets, solar generation drops to zero in a very short period, just as evening demand from residential and commercial consumers begins to peak. This creates an extremely steep "ramp-up" requirement, where grid operators must dispatch huge amounts of conventional power (typically from coal or gas plants) in a very narrow window to avoid blackouts. This daily cycle of deep midday troughs and steep evening ramps puts immense strain on the grid, increases wear and tear on thermal plants, and ironically, increases the reliance on fossil fuels to provide the critical flexibility needed during peak hours.
The Financial Bottleneck: The Persistent Issue of DISCOM Viability and Off-taker Risk
Arguably the single greatest systemic threat to India's entire energy transition is the perilous financial health of its state-owned electricity distribution companies (DISCOMs).41 These entities are the crucial link between power generators and end consumers, and their instability jeopardizes the entire value chain.
As of March 2025, India's DISCOMs collectively owed over $9 billion in unpaid dues to power generation companies. Their accumulated losses stood at a staggering $75 billion in 2023. This chronic insolvency stems from a combination of factors, including high aggregate technical and commercial (AT&C) losses, politically mandated subsidized tariffs that do not cover costs, and operational inefficiencies.
This dire financial situation creates a severe off-taker risk for all power generators, including renewable energy developers. Developers sign long-term PPAs with DISCOMs, but with a constant fear that they will not be paid fully or on time. This risk is priced into new projects, leading to a higher cost of capital for renewable energy in India compared to advanced economies, which ultimately translates into higher electricity prices for consumers.
The problem, however, goes deeper than just payment delays. The financial distress of DISCOMs is the root cause of multiple, seemingly separate challenges. Their lack of funds prevents them from making the necessary investments in upgrading and modernizing their own distribution grids to handle the influx of renewables. Their political vulnerability makes them resistant to implementing cost-reflective tariffs that could encourage demand-side management. Therefore, solving the DISCOM problem is not just one challenge among many; it is the master key that can unlock progress on grid modernization, market reform, and private investment.
Non-Grid Hurdles: Land Acquisition and Policy Consistency
Beyond the grid and financial issues, developers also face significant on-the-ground hurdles. Large-scale solar and wind projects are land-intensive, requiring vast tracts of land. The process of land acquisition in India is notoriously complex, often involving multiple government agencies, protracted negotiations with numerous small landowners, and the risk of legal disputes, all of which can significantly delay project timelines and increase costs.
Furthermore, while the national policy direction is strongly in favor of renewables, policy and regulatory volatility at the state level can create uncertainty for investors. Sudden changes to rules regarding open access charges, electricity banking provisions, or the imposition of local duties can alter the economics of a project after investments have already been committed, undermining investor confidence. Ensuring policy consistency and a stable regulatory environment across both central and state governments is crucial for maintaining the momentum of the transition.
The Path Forward: Strategic Outlook and Recommendations
Having reached the significant milestone of 48.3% renewable capacity, India stands at a critical crossroads. The era of focusing primarily on capacity addition and achieving cost-competitiveness is drawing to a close. The next, more complex phase of the energy transition demands a fundamental re-engineering of the country's grid, markets, and regulatory frameworks to manage and integrate this vast new capacity. This final section provides a forward-looking strategic outlook, outlining the indispensable solutions—energy storage, grid modernization, and market reform—that are necessary to transform India's capacity achievement into a truly decarbonized, reliable, and affordable energy future.
The Linchpin of the Transition: Scaling Energy Storage
Energy storage is no longer a niche technology but the absolute linchpin for the next stage of India's energy transition. It is the essential tool required to solve the core challenge of VRE intermittency, providing the flexibility to smooth out the "duck curve," absorb surplus generation, and ensure a stable supply of power around the clock. Recognizing this, the government has set a national target to deploy 60.63 GW of energy storage capacity by 2030. This ambitious goal is planned to be met through a combination of 41.65 GW of Battery Energy Storage Systems (BESS) and 18.98 GW of Pumped Storage Projects (PSP).
Accelerating BESS Deployment
The BESS market in India is at a crucial inflection point. After years of being constrained by high costs, the technology is now becoming commercially viable. Battery costs have plummeted by over 80% since 2015, and new revenue streams are emerging. Developers can now engage in energy arbitrage—charging batteries with cheap solar power during midday and selling it at high prices during evening peak hours—on the national power exchanges. This arbitrage opportunity alone is making merchant BESS projects financially attractive, with studies showing potential Internal Rates of Return (IRR) of up to 24%.
To catalyze this nascent market, the government's Viability Gap Funding (VGF) scheme is a critical policy instrument. The initial tranche of the scheme aims to support the development of 4,000 MWh of BESS projects by providing grants to cover up to 40% of the capital cost. This de-risks early-stage projects and helps build market confidence. The government has already announced plans for a massive expansion of this program, targeting a total of
30 GWh of BESS capacity, a move that is expected to attract over ₹33,000 crore in investment. Recent competitive tenders for BESS have seen strong participation from major developers and have discovered progressively lower tariffs, signaling growing market maturity and investor interest.
Tapping into Pumped Hydro Potential
Alongside batteries, PSP offers a mature, long-duration storage solution that is ideal for storing large quantities of energy over longer periods. India has significant untapped hydropower potential that can be developed for pumped storage applications. The recent commissioning of projects like the 250 MW unit of the Tehri PSP in Uttarakhand shows renewed momentum in this sector, which will be crucial for providing the bulk energy shifting required for seasonal balancing.
Building a 21st Century Grid: The Imperative of Modernization
A modern, flexible, and intelligent electricity grid is the second prerequisite for a high-renewable future. This modernization requires a two-pronged approach: upgrading the physical "hardware" of the grid and deploying a sophisticated digital "software" layer for control and management.
Physical Infrastructure: The immediate priority is the execution of the CEA's $30 billion Transmission Master Plan. This involves the rapid construction of the Green Energy Corridors—high-capacity transmission lines, including new High Voltage Direct Current (HVDC) systems—to physically link the renewable generation hubs in the west and south with the major consumption centers in the north and east.
Digital Infrastructure: The government's two flagship schemes for grid digitalization are the National Smart Grid Mission (NSGM) and the Revamped Distribution Sector Scheme (RDSS). A cornerstone of these schemes is the ambitious plan to install 250 million smart meters across the country by 2026. These meters are the foundational element of a smart grid, enabling real-time energy monitoring, automated outage management, and the implementation of dynamic Time-of-Use (ToU) tariffs that can incentivize consumers to shift their electricity usage away from peak hours. Beyond metering, these missions support the deployment of advanced grid management technologies like Supervisory Control and Data Acquisition (SCADA) systems, AI-driven demand forecasting, and distribution automation to give grid operators the visibility and control needed to manage a complex, decentralized power system.
Reforming the Market: Recommendations for DISCOMs, Regulators, and Investors
Technology and infrastructure alone are insufficient without a supportive market structure and financially sound institutions. The following recommendations are crucial for creating an enabling ecosystem:
For Policymakers & Regulators: The most urgent task is to address the financial unsustainability of DISCOMs through a combination of politically courageous tariff reforms, strict enforcement of payment discipline from government departments and consumers, and technical interventions to reduce losses. Secondly, the RPO framework must be strengthened with clear, enforceable penalties for non-compliance to provide a bankable demand signal. Finally, regulators must continue to design and refine market mechanisms, such as the Ancillary Services Market, that explicitly value and provide revenue streams for the grid flexibility offered by energy storage and other resources.
For Investors: The investment paradigm must shift. Standalone solar or wind projects carry increasing integration risks. The future lies in integrated or hybrid projects that combine renewable generation with energy storage (RE+Storage). This approach internalizes the intermittency risk and creates a dispatchable clean power product that is more valuable to the grid. Furthermore, investors must conduct deep, state-specific due diligence, moving beyond national trends to assess local grid conditions, curtailment risks, and the specific financial health of the contracting DISCOM. Opportunities are also expanding beyond generation into the wider value chain, including transmission infrastructure, digital energy solutions, and domestic manufacturing.
For DISCOMs: DISCOMs must proactively embrace digitalization and smart grid technologies as a means to improve their own operational and financial efficiency. They should actively partner with regulators to design and implement demand-side management programs and ToU tariffs, which can empower them to manage their load curves more effectively and reduce their power procurement costs during expensive peak hours.
Table 3: India's Energy Storage and Grid Modernization Scorecard. Note: Data compiled and synthesized from sources, and to provide a strategic overview.
Conclusion: From Capacity Milestone to True Energy Transformation
The achievement of a 48.3% renewable energy share in India's total installed power capacity is a landmark victory. It is a powerful testament to the nation's political will, policy effectiveness, and the dynamism of its private sector. This milestone successfully concludes the first chapter of India's energy transition, a chapter defined by the pursuit of scale and the achievement of remarkable cost reductions that have made renewables, particularly solar, the cheapest source of new electricity.
However, this report concludes that India has now entered a new, far more challenging chapter. The narrative must evolve from celebrating capacity to ensuring reliability. The focus must shift from building generation to building a system. Success in this next phase will not be measured in gigawatts installed but in the ability to deliver clean, affordable, and uninterrupted power to every household and industry, 24 hours a day, 7 days a week.
This profound transformation hinges on the successful and simultaneous execution of the three strategic pillars identified in this analysis: the massive scaling of energy storage, the comprehensive modernization of the electricity grid, and the fundamental reform of power markets. The journey from a 48.3% share in capacity to a dominant share in actual generation will be complex and demanding, but it is the necessary path for India to secure its energy future, drive sustainable economic growth, and assume a leadership role in the global fight against climate change.
Works cited
- Renewable Energy Capacity in India's Power Mix Reaches 48.3% in ..., accessed on August 9, 2025, https://www.mercomindia.com/renewable-energy-capacity-in-indias-power-mix-reaches-48-3-in-q2-2025
- India's Renewable Energy Share Climbs to 48.3% of Power Capacity in Q2 2025 – EQ, accessed on August 9, 2025, https://www.eqmagpro.com/indias-renewable-energy-share-climbs-to-48-3-of-power-capacity-in-q2-2025-eq/
- India posts record biannual renewable energy capacity additions in ..., accessed on August 9, 2025, https://www.rystadenergy.com/news/india-renewable-energy-capacity-additions
- India Surpasses 50% Non-Fossil Fuel Power Capacity Milestone 5 Years Early, accessed on August 9, 2025, https://climatesolutions.news/news/india-surpasses-50-non-fossil-fuel-power-capacity-milestone-5-years-early
- National Power Portal:Home, accessed on August 9, 2025, https://npp.gov.in/
- Physical Achievements | MINISTRY OF NEW AND RENEWABLE ENERGY | India, accessed on August 9, 2025, https://mnre.gov.in/en/physical-progress/
- MINISTRY OF NEW AND RENEWABLE ENERGY | India, accessed on August 9, 2025, https://mnre.gov.in/en/
- India's Renewable Energy Capacity Achieves Historic Growth ... - PIB, accessed on August 9, 2025, https://www.pib.gov.in/PressReleasePage.aspx?PRID=2120729
- Year wise Achievements | MINISTRY OF NEW AND RENEWABLE ..., accessed on August 9, 2025, https://mnre.gov.in/en/year-wise-achievement/
- India Achieves Record Renewable Generation In June 2025 With 93.75% From Solar And Wind - SolarQuarter, accessed on August 9, 2025, https://solarquarter.com/2025/07/30/india-achieves-record-renewable-generation-in-june-2025-with-93-75-from-solar-and-wind/
- India's Electricity Demand to Reach 273 GW by 2025: Can the Grid Handle the Surge?, accessed on August 9, 2025, https://www.energycentral.com/energy-management/post/indias-electricity-demand-reach-273-gw-2025-can-grid-handle-surge-SC1gsyHoh3cOyHJ
- Monthly RE Update - June 2025 - JMK Research, accessed on August 9, 2025, https://jmkresearch.com/renewable-sector-published-reports/monthly-renewable-sector-update-utility-scale-solar-wind/monthly-re-update-june-2025/
- Tracking Growth: Demand trends and capacity expansion in the power sector, accessed on August 9, 2025, https://powerline.net.in/2025/07/16/tracking-growth-demand-trends-and-capacity-expansion-in-the-power-sector/
- Financing India's just transition for an inclusive future - The World Economic Forum, accessed on August 9, 2025, https://www.weforum.org/stories/2025/08/india-just-transition-ecosystem-finance-inclusive-future/
- Energy dept’s 3.2k MW thermal power tender not required, says CEA report, accessed on August 9, 2025, https://timesofindia.indiatimes.com/city/jaipur/energy-depts-3-2k-mw-thermal-power-tender-not-required-says-cea-report/articleshow/123195977.cms
- Investment Opportunities in Renewable Energy - Invest India, accessed on August 9, 2025, https://www.investindia.gov.in/sector/renewable-energy
- Solar Overview | MINISTRY OF NEW AND RENEWABLE ENERGY | India, accessed on August 9, 2025, https://mnre.gov.in/en/solar-overview/
- India's Environmental Transformation - PIB, accessed on August 9, 2025, https://www.pib.gov.in/PressNoteDetails.aspx?NoteId=154545&ModuleId=3
- Energy Security in India - PIB, accessed on August 9, 2025, https://www.pib.gov.in/PressReleasePage.aspx?PRID=2098441
- GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.5 ANSWERED ON 03.02.2025 STATE-WISE POWER GENERATION CAPAC, accessed on August 9, 2025, https://sansad.in/getFile/annex/267/AS5_GqNV5U.pdf?source=pqars
- Government Scales Up PLI Budget to Accelerate Manufacturing - PIB, accessed on August 9, 2025, https://static.pib.gov.in/WriteReadData/specificdocs/documents/2025/mar/doc202533511601.pdf
- Government Scales Up PLI Budget to Accelerate Manufacturing - PIB, accessed on August 9, 2025, https://www.pib.gov.in/PressReleasePage.aspx?PRID=2107825
- PLI scheme drives 18.5 GW of solar module capacity up to June - pv magazine India, accessed on August 9, 2025, https://www.pv-magazine-india.com/2025/08/07/18-5-gw-of-48-gw-solar-module-capacity-awarded-under-pli-scheme-now-operational/
- India's PLI scheme drives 18.5 GW of solar module capacity up to June - PV Magazine, accessed on August 9, 2025, https://www.pv-magazine.com/2025/08/08/indias-pli-scheme-drives-18-5-gw-solar-module-capacity-by-june-2025/
- Renewable Purchase Obligations (RPOs) for UPSC Aspirants - IAS Gyan, accessed on August 9, 2025, https://www.iasgyan.in/daily-current-affairs/renewable-purchase-obligations-rpos
- Renewable Purchase obligation (RPO) - Maharashtra Energy Development Agency, accessed on August 9, 2025, https://www.mahaurja.com/meda/en/programmes/rporec/rpo
- CEEW-GFC Report: India's Renewable Energy Sector Attracts Record FDI as Clean Energy Transition Accelerates - SolarQuarter, accessed on August 9, 2025, https://solarquarter.com/2025/05/08/ceew-gfc-report-indias-renewable-energy-sector-attracts-record-fdi-as-clean-energy-transition-accelerates/
- India's renewable energy sector sees eightfold surge in FDI since FY21, hits record USD 3.4 billion in FY25 - CEEW, accessed on August 9, 2025, https://www.ceew.in/press-releases/renewable-energy-drives-india%27s-power-growth-in-fY-2024%E2%80%9325
- Amid clean energy push, India a green flag for climate investors, accessed on August 9, 2025, https://economictimes.indiatimes.com/industry/renewables/amid-clean-energy-push-india-a-green-flag-for-climate-investors/articleshow/123067885.cms
- India's Renewable Energy Capacity Hits New Milestone - PIB, accessed on August 9, 2025, https://www.pib.gov.in/PressReleaseIframePage.aspx?PRID=2073038
- India's Renewable Energy Boom: Job Creation and Sustainable Growth - PIB, accessed on August 9, 2025, https://www.pib.gov.in/PressNoteDetails.aspx?NoteId=153238&ModuleId=3
- Future Skills And Job Creation With Renewable Energy in India - CEEW, accessed on August 9, 2025, https://www.ceew.in/publications/how-will-renewable-energy-create-future-skills-jobs-india
- Building the Workforce for India's Emerging Clean Energy - CEEW, accessed on August 9, 2025, https://www.ceew.in/publications/building-workforce-indias-emerging-clean-energy
- Why Indian investors should look at Silver in 2025: The metal poised for growth, accessed on August 9, 2025, https://economictimes.indiatimes.com/markets/commodities/news/why-indian-investors-should-look-at-silver-in-2025-the-metal-poised-for-growth/articleshow/123073465.cms
- MoSPI Report - Energy Statistics India 2025, accessed on August 9, 2025, https://www.mospi.gov.in/sites/default/files/publication_reports/Energy_Statistics_2025/Energy%20Statistics%20India%202025_27032025.pdf
- (PDF) Review on Solar Energy in India, Achievements (2021-2025), and Benefits of Solar Energy - ResearchGate, accessed on August 9, 2025, https://www.researchgate.net/publication/392814512_Review_on_Solar_Energy_in_India_Achievements_2021-2025_and_Benefits_of_Solar_Energy
- Biomass Power/ Bagasse Cogeneration Biomass Cogeneration ..., accessed on August 9, 2025, https://cdnbbsr.s3waas.gov.in/s3716e1b8c6cd17b771da77391355749f3/uploads/2025/08/20250808527822728.pdf
- Unlocking India's Energy Transition: Addressing Grid Flexibility Challenges and Solutions - Ifri, accessed on August 9, 2025, https://www.ifri.org/sites/default/files/2025-02/ifri_raizada_unlocking_india_energy_transition_2025_0.pdf
- India – World Energy Investment 2025 – Analysis - IEA, accessed on August 9, 2025, https://www.iea.org/reports/world-energy-investment-2025/india
- Reinvigorating India's Electricity Distribution for Access, Reliability, and Digitalization, accessed on August 9, 2025, https://www.worldbank.org/en/results/2025/07/10/reinvigorating-india-s-electricity-distribution-for-access-reliability-and-digitalization
- Renewables Integration in India – Analysis - IEA, accessed on August 9, 2025, https://www.iea.org/reports/renewables-integration-in-india
- Topic: India's Renewable Energy Transition - Key Developments and Challenges in 2025, accessed on August 9, 2025, https://www.exaministry.com/current-affairs/indias-renewable-energy-transition-key-developments-and-challenges-in-2025
- The age of storage: Batteries primed for India's power markets - Ember, accessed on August 9, 2025, https://ember-energy.org/latest-insights/the-age-of-storage-batteries-primed-for-indias-power-markets/
- The age of storage: Batteries primed for India's power markets - Ember, accessed on August 9, 2025, https://ember-energy.org/app/uploads/2025/08/The-age-of-storage-Batteries-primed-for-Indias-power-markets.pdf
- Power Ministry Amends VGF Guidelines for Battery Energy Storage Projects - Mercom India, accessed on August 9, 2025, https://www.mercomindia.com/power-ministry-amends-vgf-guidelines-for-battery-energy-storage-projects
- India successfully met peak power demand of 241 GW on 9th June, 2025 with zero peak shortage: Shri Manohar Lal - PIB, accessed on August 9, 2025, https://www.pib.gov.in/PressReleasePage.aspx?PRID=2135450
- India's Energy Outlook to 2035: A Clean Energy & Grid Transformation Journey - ISGF, accessed on August 9, 2025, https://www.indiasmartgrid.org/news-detail/indias-energy-outlook-to-2035-a-clean-energy-grid-transformation-journey
- National Smart Grid Mission, Ministry of Power, Government of India, accessed on August 9, 2025, https://www.nsgm.gov.in/en/smart-grid
- India's Smart Metering Initiative: Progress, Challenges, and the Road Ahead for Power Distribution - Eninrac, accessed on August 9, 2025, https://eninrac.com/horizon/insights/indias-smart-metering-initiative-progress-challenges-and-the-road-ahead-for-power-distribution/
- India Grid Modernization Market Size, Growth | Forecast 2033 - IMARC, accessed on August 9, 2025, https://www.imarcgroup.com/india-grid-modernization-market
- DELENG18998 June 2025 - India Smart Grid Forum, accessed on August 9, 2025, https://indiasmartgrid.org/isgf/public/bulletin/1753075981nU7Gvw8Mey8lfzpbAtIxENXZywiTLTtuXTCp5tGb.pdf
- India Energy Industry Research Report 2025-2035 | Future Demand-supply Dynamics - Renewables and New Energy Sources Playing a Dominant Role - ResearchAndMarkets.com - Business Wire, accessed on August 9, 2025, https://www.businesswire.com/news/home/20250807796734/en/India-Energy-Industry-Research-Report-2025-2035-Future-Demand-supply-Dynamics---Renewables-and-New-Energy-Sources-Playing-a-Dominant-Role---ResearchAndMarkets.com
- Electricity sector in India - Wikipedia, accessed on August 9, 2025, https://en.wikipedia.org/wiki/Electricity_sector_in_India